Collection of blades completed

Collection of blades completed

BLASGON has already collected 12 wind turbine blades out of use, necessary for the execution of the project. All of them have been previously cut in the wind farm to facilitate the transport to their facilities. Therefore, the waste with which to work on the project...
Firtst monitoring meeting NEEMO-IDOM / EASME

Firtst monitoring meeting NEEMO-IDOM / EASME

On May 25th, the first monitoring meeting of LIFE REFIBRE project was held at ICCL facilities, in Burgos (Spain). During the meeting, the project team together with the NEEMO external monitor, Josefa Diamantopoulos, and the senior project adviser at EASME, Aurelio...
LIFE REFIBRE-LIFE BRIO connection

LIFE REFIBRE-LIFE BRIO connection

On May 18th, LIFE REFIBRE and LIFE BRIO projects partners held a meeting in Madrid, in IBERDROLA facilities, in order to start working more closely together sharing knowledge and experiences. The result was a fruitful meeting to launch these actions.
2nd periodic meeting of the LIFE REFIBRE project

2nd periodic meeting of the LIFE REFIBRE project

On May 3, the second follow-up meeting of the LIFE REFIBRE project was held at the CARTIF facilities, Boecillo, in which we evaluated the progess of the project and prepared the visit for the European Commission that is going to be at the end of this month.
Optimal logistic model performed

Optimal logistic model performed

A study has been carried out to obtain an optimized logistic model, to collect the blades of wind turbine out of use from the origin and transport them to the treatment plant. The objective of this logistic model has been to maximize the efficiency of the transport of...
First milling test

First milling test

During the test, representative specimens of aerogenerator blades collected were milled in a hammer mill during differents residence time in it. Through this test, we have known the behaviour of the aerogenerator blades during this milling process in order to obtain...